Populate the previously-empty .omc/project-memory.json so teammates and
future OMC sessions inherit context: 4 user directives (SoT location,
greenfield/next-step, locked design decisions, measurement-gated residual),
3 notes (architecture, tech stack, env), and the decided tech stack.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Fold post-plan decisions into the spec and consensus plan:
- Q1 deploy HW: undecided/mixed → delegate to hardware-adaptive auto-sizing
- Q2 model strategy: collapse to single turbo model if P1 bench entity ≥95%
- Q3 cancellation: cooperative (segment-boundary) is sufficient; no hard-kill
- Q4 concurrency N: delegate to boot-time auto-sizing (AC-8 = ≤5s within auto N)
Recompute clarity with the deep-interview model (Goal 0.96 / Constraint 0.95
/ Success 0.95 → Total 0.954): ambiguity ~10% → ~5%. Residual is now entirely
measurement/code-gated (AC-4 R-WER baseline, hybrid→single confirmation,
CT2 GIL) — next lever is P1 bench, not further interview.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>